IfU TECOTHERM NEO TN300 EN - 01.doc
Page 40 of 76
Ref No. TN300 EN-01
8. TECOTHERM NEO Hypothermia System Putting into Operation
8.1
Initial Set Up / Initial Operation
The manufacturer or authorized service personnel should initially set up TECOTHERM
NEO system. The operators should be traned how to run the system.
8.2
Initial Operation by the customer: Pre- operation Check up
Caution
Ensure that power cord matches the shockproof
socket at site (230V 50Hz or 110V 60Hz ).
Caution
Ensure that right proper temperature probes
have been prepared and prepositioned.
Caution
Ensure that proper mattress/ wrap and
interlayer foils have been prepared and prepositioned
Pre- operation Check up
Prior to putting the system into operation, check the
conditions section 6
to ensure
safe and proper operation:
For a reliable and safe operation use only original components, applied parts
and spare parts supplied or recommended by the manufacturer.
Without rectal temperature probe plugged to port “R” it is
not possible
to start
treatment modes 1 and 2.
Check that TECOmed (or approved substitute) is used as circulating fluid.
Check that TECOmed (or approved substitute) is used as circulating fluid.
Check whether temperature probe connectors match their sockets R and S at
the device front panel
8.3
Initial Operation by the customer
If mattress is positioned into an incubator read notes in Section 6.
Plug the cable cord into rear socket. Then plug the system to the mains 230 V / 50 Hz
into shock-proofed socket. The equipment is prepared for operation at 230VAC.
Note
Immediately after plugging to mains TECOTHERM NEO is in its Stand-
by mode. Key (1) is lit light green.