Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 71 of 84
© inge GmbH
Connection Dimensions
Requirements
The T-Rack
®
being mounted must be directly connected to an existing connection pipework that:
ends toward the T-Rack
®
with pipes whose ends feature a groove for the coupling connection
ends toward the T-Rack
®
with flange surfaces
If premanufactured collector pipes are used, e.g. "T-Rack
®
Manifolds" from inge GmbH, it is necessary to first
complete the connection pipework and then mount the T-Rack
®
3.0.
The Flexi Kit from inge
®
can be used to compensate for small level differences. This Flexi Kit
is not part of the standard scope of supply but can be ordered optionally.
Connecting Pipework with Coupling Connection
Step
Activity
1
Check the connection pipework
a)
Ensure that all pipes of the connecting pipework are secured in a stable and form-fitting
manner.
There must be no change in position and angle between the connection points and the
T-Rack
®
s during operation.
b)
Check all specified connection dimensions for pipe distances, length offsets and angular
offsets.
If the specified connection dimensions are not met, stop the mounting procedure of the
T-Rack
®
and adjust the connecting pipework.
Mounting may continue after the specified connection dimension tolerances have been met.
2
Lubricate the gaskets with glycerin
1925
120
-
180
88
410
The permissible dimensional deviation
between T-Rack
®
and the connecting
pipework is 1°or 2 mm at Ø 168.