Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 45 of 84
© inge GmbH
Step
Activity
Figure
4
Mount the 90° elbow pieces PP 2” on the filtrate pipe
a)
Position the transparent filtrate pipe and one 90° elbow
piece PP 2“ with the openings facing each other.
b)
Pull the gasket of the filtrate pipe over the 90° elbow
piece
PP 2“ so it is centered between the grooves of
the two parts.
c)
Place a flexible coupling 2” half-shell around the
gasket.
Ensure that the contact surfaces of the coupling half-
shells are resting in the provided grooves.
d)
Place the second flexible coupling 2” half-shell on the
first and insert the bolts in the openings.
e)
Tighten the flexible coupling 2” with two nuts M10 and
washers using an open-end or box wrench (size 17)
until the contact surfaces of both coupling halves are
flush and resting against each other without a gap.
Ensure that the nuts are tightened evenly and
alternately.
f)
Repeat procedures a) to e) for the other end of the
transparent filtrate pipe.
Ensure that the two 90° elbow pieces PP 2“ are facing
roughly in the same direction. The exact alignment will
be made in a later step.