Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 60 of 84
© inge GmbH
5.12.3 Mounting the Second Filtrate Header
Step
Activity
Figure
1
Mounting the filtrate header
a)
Mount the second filtrate header on the mounting clamp
PE of modules 3 and 12 according to the procedure as
described in sections:
Mounting the first Filtrate Header
Connecting the Modules to the Filtrate Header
NOTE
The filtrate headers will now be longer than the row of
modules (top and bottom). This difference can be up to
approximately
2 mm
per T-piece composite coupling.
After completion of the installation and subsequent
pressurizing with water, this difference will significantly
reduce or disappear depending on the applied pressure
during filtration and/or backwash.
2 mm per
coupling