Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 54 of 84
© inge GmbH
3
Mount the channel section (DIN 1026) (U profile 50x38 mm
with four holes) and mounting clamp PE
Number of persons: 2
a)
Continue holding modules 1, 2 and 3 in position to prevent
tipping.
b)
Hold the other connecting brace (profile opening facing up).
c)
Position the channel section (DIN 1026) (profile opening
facing up) on the T pieces of modules 1 and 3 so that the
threaded pins (DIN 913) M10 x 50 extend through the four
drilled holes.
d)
Place one mounting clamp PE on the threaded pins (DIN
913) M10 x 50 of module 1 and one mounting clamp PE on
the threaded pins (DIN 913) M10 x 50 of module 3.
e)
Place a washer (DIN 125) A10.5 on each threaded pin
(DIN 913) M10 x 50.
f)
Screw a hexagon nut (DIN 934) M10 hand-tight onto each
threaded pin (DIN 913) M10 x 50.
Steps 2 and 3 must be repeated for the end modules
(modules 11 and 12 in this description) in order to mount
the filtrate collector
5.12.1 Mounting the first Filtrate Header