Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 40 of 84
© inge GmbH
5.4.3
Checking the Delivery for Completeness
Step
Activity
Figure
1
Remove the packing list.
You will find the packing list in a red pouch on the packaging.
2
Check the completeness of the delivery against the packing
list.
All packages on the packing list must be present.
3
Promptly inform your contact at inge GmbH if the number of
pieces differs between the packing list and the existing
packages.
5.4.4
Unpacking the Parts
NOTE
CAUTION, PROPERTY DAMAGE!
In case of abrupt temperature changes.
Store the modules for at least two days at temperatures above
freezing before opening the packaging carton.
Step
Activity
Figure
1
Unpacking the Packaging
a)
Remove the packaging and labeling.
b)
Remove the wooden boards of the modules on the outside
by releasing the screws with a hex key (size 6).
2
Unpacking the Component Crate
a)
Remove the cardboard cover.
b)
Remove the screws securing the cover plate using a Torx
screwdriver T 20.
c)
Open the transparent plastic bags containing the small
parts. Leave the nuts and washers on the bolt.