Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 35 of 84
© inge GmbH
5.3
Preparing for Assembly
5.3.1
Checking the Available Space
NOTE
CAUTION, PROPERTY DAMAGE!
Potential damage due to exposure to the weather or impermissible
temperatures.
Weather and Temperature Protection
At the location where you are planning to erect the T-Rack
®
sub-unit, ensure the following:
The unit is always protected by a roof
Permanent protection against the weather is provided
The temperatures are always within the permissible temperature range from 0°C to +40°C.
Space Conditions
Check the space conditions around the assembly area.
Ensure that there is enough space to allow the T-Rack
®
to be installed, disassembled and
operated safely.
CAUTION
DANGER OF INJURY!
Danger of injury due to constricted space.
Provide for sufficient space!
Comparison of Room Heights
Compare the existing room height with the required assembly height.
The maximum height of the system and the required clear room height is shown in the following
table:
T-Rack
®
Unit
System height
Clear room height
T-Rack
®
3.0
mm
max. 2,695
min. 2,945
T-Rack
®
3.0 S
mm
max. 2,363
min. 2,613
Ensure that the necessary room height is available.
CAUTION
DANGER OF INJURY!
Danger of injury due to inadequate room height.
Provide for sufficient room height!