Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 46 of 84
© inge GmbH
Step
Activity
Figure
5
Mount the filtrate pipe assembly on the module
a)
Place module 1 on the floor so that the T-piece
opening faces down, which will face the next module of
the sub-unit just mounted.
b)
Position the opening of the 90° elbow piece PP 2“ and
the filtrate port so they are flush.
c)
Pull the gasket from the filtrate port over the 90° elbow
piece PP 2“ so that the gasket is centered on the
connection surfaces of the port and 90° elbow piece
PP 2“.
d)
Position the flexible coupling 2” half-shell onto the filter
port and 90° elbow piece PP 2“ with the gasket from
below.
Ensure that the contact surfaces of the coupling half-
shells are resting in the provided grooves.
e)
Place the second flexible coupling 2” half-shell on the
first and insert the bolts in the threaded openings of the
half-shell.
f)
Position the filtrate pipe assembly parallel to the
longitudinal axis of the module.
g)
Tighten the flexible coupling 2” with two nuts M10 and
washers using an open-end or box wrench (size 17)
until the contact surfaces of both coupling halves are
flush and resting against each other without a gap.
Ensure that the nuts are tightened evenly and
alternately.