5.14.5 Mounting the Module with a Crane
Requirement
Before
beginning
the procedure to mount the module with a crane, the threaded pins (DIN 913) M10 x 50
must be mounted at the bottom T piece and the filtrate pipe assembly must be mounted on the module.
See sections:
5.7.1 Assembling the Filtrate Pipe Assembly
5.7.2 Mounting the Module on the Channel Section (DIN 1026)
Mounting with a Crane
Number of persons: 2
Step
Activity
Figure
1
Attach the module using a mounting strap (min. load capacity of
60 kg) directly under the upper T piece and place the loop into the
crane hook.
The connection of the T piece must face up.
The mounted filtrate pipe assembly is located on the side.
2
Carefully lift the module using the crane.
3
Hold the module at the T piece and stabilize it throughout the
transport procedure.
4
Move the module to the installation position with a crane.
5
Lower the module until both threaded pins (DIN 913) M10 x 50 are
inserted in the two holes in the channel section (DIN 1026).
6
Keep the mounting strap taut so that the module cannot tip.