Installation / Assembly
T-Rack
®
3.0 Series
– Assembly Instructions 1.1(2019-03) E inge
Page 59 of 84
© inge GmbH
5.12.2 Connecting the Modules to the Filtrate Header
Step
Activity
Figure
1
Connect the modules of the first row to the filtrate header
a)
Position the openings of the 90° elbow piece PP 2“ (filtrate
pipe assembly) of module 1 and the filtrate port on the
filtrate header so they are flush.
b)
Pull the gasket from the filtrate port over the 90° elbow
piece PP 2“ so that the gasket is centered on the
connection surfaces of the port and 90° elbow piece PP 2“.
c)
Place a flexible coupling 2” half-shell around the gasket
that connects the filtrate port and the 90° elbow piece PP
2“.
Ensure that the contact surfaces of the coupling half-shells
are resting in the provided grooves.
d)
Place the second flexible composite
couplings 2” half-shell
on the first and insert the two bolts in the openings of the
half-shell.
e)
Tighten the flexible couplings 2” with two nuts M10 and
washers using an open-end or box wrench (size 17) until
the contact surfaces of both coupling halves are flush and
resting against each other without a gap.
Ensure that the nuts are tightened evenly and alternately.
f)
Repeat the procedure as described from a) to e) for
modules 2, 5, 7, 9 and 11.