EonStor DS S12/S16/S24 Series Hardware Manual
and then push both of the ejection levers upwards to secure the controller into
chassis.
6. Secure the controller by fastening two screws you previously removed to the
ejection levers.
2.5.5
Inserting the RAID Controller
After completing the battery backup unit and flash backup module installation, the
RAID controller can be re-installed on the chassis:
1. Insert the controller slowly into the module slot. When you feel the contact
resistance by your hands, use more force, and then push both of the ejection
levers upwards to secure the controller into chassis.
2. Secure the controller by fastening the two screws you previously removed to the
ejection levers.
Ejection levers
NOTE
Installation of the CBM on the controller should occur before rack-mounting.
A new or replaced BBU takes at least 12 hours to charge to its full capacity.
Follow the procedures shown in
Replacing the Controller Module
, to replace a faulty
BBU with a new one in order to maintain fault-tolerant features.
55