EonStor DS S12/S16/S24 Series Hardware Manual
Step 1
DONE
Unpack
Rack-mounting
CBM installation
(if purchased separately)
Hard drive installation
Drive tray installation
Cabling
Power up
RAID configuration
(refer to firmware
Operation manual)
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
Step 8
DONE
DONE
DONE
DONE
DONE
DONE
2.3
Unpacking the Subsystem
Compare the
Unpacking List
included in the shipping package against the actual
package contents to confirm that all required materials have arrived. Carefully check
the items contained in each box before proceeding with installation.
Each packed box is separated into upper and lower levels.
2.3.1
Box contents
Upper level box contents
: Drive canisters
Lower level contents:
The enclosure is placed at the bottom of the carton with two
boxes that contain power cords and accessories.
The accessory items include a serial port cable, screws,
Quick Installation Guide
, a
CD containing the
SANWatch
management software and its manual and
Firmware
Operation Manual
, and a product utility CD containing the
Installation and
Hardware Reference Manual
(this document).
2.3.2
Preinstalled Components
Shown below are the components pre-installed in the subsystem:
LCD/LED front panels
Chassis ears with plastic caps
Controller
module(s)
46