EonStor DS S12/S16/S24 Series Hardware Manual
3.8.5
LCD Screen
When powering on the RAID subsystem, wait for the front panel LCD screen to show
“
READY
” or “
No Host LUN.
”
The LCD screen startup sequence is shown and described in the sequence below:
Initializing…
Please Wait...
This screen appears when the PSUs are
turned on.
Power On Self Test Please
Wait…
System is performing a self test.
Power on
Init Completed..
System power-on self test is completed.
DS S12x-xxxx
System is accessing various interfaces.
DS S12x-xxxx
1GB RAM, Wait...
Verifying installed memory.
DS S12x-xxxx
System is ready. You can now start to
configure the subsystem.
DS S12x-xxxxx
Ready
System is ready for I/Os.