Installation
4-5
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
Using the jumpers XT1 or XT2, Earth or 24 V can be connected to the RS232 inter-
face by changing the positions of the jumper (Pin 2 and 3). On delivery: XT1 or XT2,
Pin 1 and 2 bridged
#
"default setting (Standard) RS232“.
The jumpers are located on the interface board and are accessible after opening the
cover.
Pin
Assignment
1
24V can tied-in via the jumper XT2, maximum current consumption 0.3 A (Pin 2
and 3 connected). As delivered, 24 V are not tied-in, Pin 1 and 2 connected.
2
TxD
3
RxD
4
GND 24 V can be tied-in via jumper XT1 (Pin 2 and 3 connected). On delivery,
GND 24 V is not tied-in (Pin 1 and 2 connected).
5
GND RS232
6
not used
7
not used
8
not used
9
not used
STOP
Danger
Danger of fatal injuries due to electric shock!
First, disconnect the leak test device from the power supply network and then
remove the housing.
Fig. 4-3 Jumper XT2 and XT1
Item
Description
1
Pin 1
2
Pin 2
3
Pin 3
Summary of Contents for 550-300A
Page 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Page 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Page 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Page 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Page 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Page 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Page 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Page 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...