Technical Data
9-11
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
p1 (Inlet pressure) / p2 (Fore-vacuum pressure) UL200
The inlet pressure p1 or the fore-vacuum pressure p2 is displayed. This assignment
refers to the logarithmic recorder output of the leak detector UL200.
Pressure logarithmic:
U = 1 to 10 V; 0.5 V/decade starting with
1 V = 1·10
-3
mbar / 1·10
-3
Pa
LR lin
The leak rate output voltage is linearly scaled. The output voltage is 0 - 10V. The
upper limit (refers to 10 V) and the scale division (in Volt/decade) is set via the
optional control unit in "Scale recorder output".
LR log
The leak rate output is logarithmically scaled. The output voltage is 1 … 10 V in
optional steps from 0.5 to 10 volts per decade. The scale (in volts/decades) is set via
the optional control unit in "Scale recorder output".
Example for signal LR log:
The upper limit value is set to 10
-5
mbarl/s (= 10 V)
Scale division is set to 5 V/decade.
The lower limit is at 10
-3
mbarl/s (= 0 V)
LR mantissa:
The leak rate mantissa is linearly displayed from 1…10V.
Fig. 9-1 TPR-characteristics (P1, P2; Recorder Output)
Summary of Contents for 550-300A
Page 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Page 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Page 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Page 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Page 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Page 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Page 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Page 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...