7-12
Maintenance tasks
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
7.7.3
Replace fuses on interface board
The interface board (SSK) includes the fuses for the inputs and outputs on the board.
Please find an overview on the fuses and their purpose in
7.7.1
Overview on Electri-
cal Fuses
.
Required Tools
• Allen key SW 8
Required material
• Complete set of fusesOrder No.: 200 000 641
Access to the fuses is only possible when the cover of the Modul1000 has been
removed. Follow the instructions in
7.5.1
Opening of the Device
.
Notice:
Please observe the safety instructions in this chapter.
• After the cover has been removed, the fuses on the interface board are
accessible. Refer to
Fig. 7-6
.
Fig. 7-6 Fuses on interface board (SSK)
Item Description
Item Description
1
Interface board SSK
2
I•STICK
F 1
F 2
F 3
F 4
F 5
F 6
1
2
Summary of Contents for 550-300A
Page 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Page 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Page 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Page 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Page 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Page 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Page 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Page 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...