5-5
Working Modes
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
5.4.1
Design of a leak detector system
Design of a leak detector system with Modul1000- - -Commander function is mainly
the same as that of the conventional integrated leak test system.
The vacuum chamber is evacuated by the Modul1000, optionally also in partial flow
mode (
Fig. 5-1
Partial flow mode
). The test sample in the vacuum chamber is
connected to the helium filling station through the chamber walls and is filled with
helium after the chamber has been evacuated.
Due to the difference between the helium pressure in the test sample and the
vacuum in the vacuum chamber, the helium of a leaky part flows out of the leak into
the vacuum chamber and into the leak test device where it can be measured as gas
leak.
Fig. 5-2 Leak detector system
Item
Description
Item
Description
V30
Valve evacuation (test sample)
1
Vacuum chamber
V31
Flood valve (test sample)
2
Test sample
V32
Valve for helium recovery
3
Pressure gauge
V33
Filling valve (test sample)
4
Vacuum valve (test sample)
V34
Emergency valve (de-energized
open)
5
Fore-pump (Modul1000)
Summary of Contents for 550-300A
Page 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Page 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Page 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Page 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Page 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Page 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Page 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Page 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...