6-1
Operation
jinb
80
e1
-h
Op
er
at
in
g
M
anua
l
(1
50
1)
6
Operation
6.1
Switching ON
Install the device as described in the Installation chapter. Connect the power cable.
Switch the device ON. The mains switch and the connection for the power cable are
at the back of the device.
After the mains switch has been actuated the devices runs up automatically.
In run-up mode (
d
3 Min.) the following items appear on the display:
• Speed of the turbo-molecular pump
• Fore-vacuum pressure
• State of emission
• Active filament
• A bar graph which shows the run-up progress
After the run-up has been completed, the Modul1000 is in „Standby“ mode.
6.2
Status LED
The LEDs show the operating mode of the device:
Operating mode:
LED, green
LED, yellow
Run-up
Flashes
Flashes
Standby/Vent
On
Off
Evacuate
On
Flashes slowly
Measuring
On
On
Calibrating
Flashes synchronously
Flashes synchronously
Error / Warnings /
Maintenance messages
Off
Flashes fast
Summary of Contents for 550-300A
Page 6: ...1 4 Content jinb80e1 h Operating Manual 1501 ...
Page 10: ...1 8 Operating instructions jinb80e1 h Operating Manual 1501 ...
Page 18: ...2 8 Important safety instructions jinb80e1 h Operating Manual 1501 ...
Page 26: ...3 8 Description of equipment jinb80e1 h Operating Manual 1501 ...
Page 111: ...Technical Data 9 23 jinb80e1 h Operating Manual 1501 9 7 Commander mode Fig 9 14 Flow Chart ...
Page 112: ...9 24 Technical Data jinb80e1 h Operating Manual 1501 9 8 CE Certificate Fig 9 15 ...
Page 122: ...10 10 Error Messages and Warnings jinb80e1 h Operating Manual 1501 ...
Page 124: ...11 2 Ordering Information jinb80e1 h Operating Manual 1501 ...