Contents
Figures . . . . . . . . . . . . . . . v
Tables . . . . . . . . . . . . . . . vii
Safety and environmental notices . . . ix
Inspecting the SAN Volume Controller for unsafe
conditions
Inspecting the uninterruptible power supply for
unsafe conditions .
Uninterruptible power-supply requirements .
Emergency power-off shutdown .
Handling static-sensitive devices
Environmental notices and statements .
Product recycling and disposal .
About this guide . . . . . . . . . . xix
SAN Volume Controller library and related
publications .
How to order IBM publications .
SAN Volume Controller initial
installation overview . . . . . . . . xxv
Chapter 1. SAN Volume Controller
overview . . . . . . . . . . . . . . 1
SAN Volume Controller operating environment.
Cabling of redundant ac-power switch (example)
Chapter 2. Installing the SAN Volume
Controller 2145-CG8 hardware . . . . . 7
Preparing for the hardware installation
Optionally installing the redundant ac-power switch 12
Attaching the mounting plates to the redundant
ac-power switch .
Connecting the input-power cables to the
redundant ac-power switch .
Installing the redundant ac-power switch in the
rack .
Connecting the redundant ac-power switch to the
site power .
Testing the redundant ac-power switch .
Installing the support rails for the 2145 UPS-1U
Installing the 2145 UPS-1U in the rack
Installing the 2145 UPS-1U cable-retention
bracket .
Installing the SAN Volume Controller 2145-CG8 .
Installing the support rails for the SAN Volume
Controller 2145-CG8
Installing the cable-management arm for the SAN
Volume Controller 2145-CG8
Installing the SAN Volume Controller 2145-CG8
in a rack .
Connecting the SAN Volume Controller 2145-CG8 to
the 2145 UPS-1U.
Installing the SAN Volume Controller 2145-CG8
cable-retention brackets .
Connecting the SAN Volume Controller 2145-CG8 to
the SAN and to the Ethernet network
Verifying the SAN Volume Controller 2145-CG8
installation
Appendix B. SAN Volume Controller
physical installation planning . . . . . 47
SAN Volume Controller 2145-CG8 environment
requirements .
Redundant ac-power environment requirements .
Uninterruptible power-supply environment
requirements .
Power cables for the 2145 UPS-1U .
SAN Volume Controller 2145-CG8 controls and
indicators .
SAN Volume Controller 2145-CG8
operator-information panel .
© Copyright IBM Corp. 2012
iii
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...