CAUTION:
To avoid any hazard from the rack tipping forward when devices are installed,
observe all safety precautions for the rack into which you are installing the
device.
About this task
Perform the following steps to install the 2145 UPS-1U in the rack.
Note:
You might have already completed steps 3 through 6 on page 23 if you used
the
Read Me First
pamphlet, which is included with the 2145 UPS-1U.
Procedure
1.
Stand at the front of the rack and place the back of the 2145 UPS-1U onto the
support rails, and then slide the 2145 UPS-1U into the rack.
CAUTION:
The 2145 UPS-1U weighs 16 kg (35.3 lb). If you feel unsure about lifting the
uninterruptible power supply to its location in the rack, seek assistance or
remove the battery to reduce its weight.
2.
At the front of the 2145 UPS-1U, install the two mounting screws (M6x10)
1
as shown in Figure 12.
3.
If you have not already connected the internal battery connector, remove the
2145 UPS-1U front panel, shown in “Installing the 2145 UPS-1U in the rack” on
page 20, by pulling the panel forward (1), then pushing to the left (2).
1
svc00008
Figure 12. Mounting screws for the 2145 UPS-1U
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
21
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...