Make sure that the support rail is located between the 2 nailhead features.
4.
You may wish to return to this section once these actions have been performed.
After you have installed the node and have attached the cables the rear of the
node:
a.
Route the data cables and power cords along the cable-management arm, as
shown
1
If you attach the arm properly and route the cables properly, the arm
swings into the rack as you pull the node forward in the rack, opening to
allow the cables to follow the node toward the front of the rack. You can
perform some service procedures without disconnecting the Fibre Channel
cables and the Ethernet cables. You can also perform some service
procedures without turning off the node or disconnecting the power cables.
b.
Secure the cables with cable ties or hook-and-loop fasteners.
Note:
Leave some slack in all of the cables to avoid tension in the cables as the
cable-management arm moves.
Figure 28. Adjusting the location of the cable-management arm
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
33
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...