3.
Position the redundant ac-power switch in the rack first, pushing the cables
through to the front of the rack. Mount in place, as shown in Figure 7, using
the four M6 screws.
Connecting the redundant ac-power switch to the site power
You must connect the redundant ac-power switch to the site power before you test
the redundant ac-power switch.
About this task
Perform the following steps to connect the redundant ac-power switch to the site
power:
Procedure
1.
Determine a suitable cable route from the redundant ac-power switch to the
power distribution units.
2.
Route the main input-power cable of the redundant ac-power switch to the
specified power distribution unit, and connect it.
3.
Route the backup input-power cable of the redundant ac-power switch to the
specified power distribution unit, and connect it.
svc00292
Figure 6. Positioning the clips
Figure 7. Positioned in rack
Chapter 2. Installing the SAN Volume Controller 2145-CG8 hardware
15
Summary of Contents for SAN Volume Controller 2145-CG8
Page 6: ...vi SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 8: ...viii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 28: ...xxviii SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 34: ...6 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 72: ...44 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 100: ...72 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 102: ...74 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 104: ...76 SAN Volume Controller Model 2145 CG8 Hardware Installation Guide...
Page 109: ......
Page 110: ...Part Number 31P1669 Printed in USA GC27 3923 02 1P P N 31P1669...