Table
2.
Firmware
Checkpoints
(continued)
Checkpoint
Description
Action/
Possible
Failing
FRU
E506
Reset
time
base
of
processors
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E509
Begin
configuring
EADS
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E50C
Copy
all
of
the
memory
ranges
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E50D
Copy
all
of
the
I/O
data
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E50F
Clean
up
the
error
registers
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E51F
End
of
I/O
configuration
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E523
Initialize
data
structures
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E537
Configuring
the
I/O
subsystem
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E53B
End
of
looking
for
next
node
port
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E540
Begin
initialization
of
I/O
drawer
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E541
Initialize
the
routing
table
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E54A
Configure
the
I/O
drawer
Replace
the
CEC
backplane,
U0.1-P1.
E560
Begin
initializing
the
I/O
drawer
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E56F
End
initializing
the
service
processor
control
chip
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
E580
Begin
initializing
the
EADS
module.
1.
Check
for
system
firmware
updates.
2.
Go
to
“MAP
1540:
Problem
Isolation
Procedures”
on
page
87.
Chapter
4.
Checkpoints
121
Summary of Contents for 9114-275 - IntelliStation POWER 275
Page 1: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Page 2: ......
Page 3: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Page 14: ...xii IntelliStation POWER 9114 Model 275 Service Guide ...
Page 16: ...xiv IntelliStation POWER 9114 Model 275 Service Guide ...
Page 50: ...32 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 58: ...40 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 81: ...Yes Go to Step 1321 16 on page 64 Chapter 3 Maintenance Analysis Procedures MAPs 63 ...
Page 210: ...192 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 246: ...228 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 320: ...System Parts 302 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 330: ...312 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 332: ...314 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 336: ...318 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 340: ...322 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 375: ......