Note:
A
spinning
(or
twirling)
slash
displays
in
the
upper-right
corner
of
the
operator
panel
display
while
some
checkpoints
are
being
displayed.
If
the
slash
stops
spinning,
a
hang
condition
is
indicated.
Table
1.
Service
Processor
Checkpoints
Checkpoint
Description
Action/
Possible
Failing
FRU
8000
Test
of
the
service
processor
DRAM
See
note
1
on
page
112.
8004
Verify
base
code
checksum
See
note
1
on
page
112.
8008
Verify
base
code
mirror
checksum
See
note
1
on
page
112.
8009
Set
NVRAM
configuration
in
TITAN
See
note
1
on
page
112.
800F
Start
base
code
See
note
1
on
page
112.
8010
Start
supervisor
in
base
code
See
note
1
on
page
112.
8012
Initialize
hardware
interrupts
See
note
1
on
page
112.
8014
Allocate
and
initialize
area
in
DRAM
See
note
1
on
page
112.
8016
Initialize
debugger
and
build
VPD
See
note
1
on
page
112.
8018
Initialize
service
processor
interfaces
See
note
1
on
page
112.
801A
Initialize
external
FLASH
load
See
note
1
on
page
112.
801B
Initialize
and
test
ISA
hub
chip
See
note
1
on
page
112.
801C
Initialize
and
test
SUPER
I/O
chip
See
note
1
on
page
112.
801F
Initialize
diskette,
verify
VDASD
and
start
operational
loader
See
note
1
on
page
112.
809x
Related
to
recovery
mode
system
firmware
update
from
diskette
See
note
3
on
page
112.
8092
Diskette
initialization
during
recovery
mode
system
firmware
update
See
note
3
on
page
112.
8098
Firmware
image
being
read
during
recovery
mode
system
firmware
update
See
note
3
on
page
112.
809C
Firmware
image
being
written
during
recovery
mode
system
firmware
update
See
note
3
on
page
112.
809F
Diskette
error
during
recovery
mode
system
firmware
update
See
note
3
on
page
112.
8100
Start
operational
loader
See
note
1
on
page
112.
81xx
Load
code
into
DRAM
from
VDASD
(where
xx
=
number
of
loads)
See
note
1
on
page
112.
81FE
Load
service
processor
operating
system
See
note
1
on
page
112.
81FF
Start
service
processor
operating
system
See
note
1
on
page
112.
9000
Primary
service
processor
task
initializing
See
note
1
on
page
112.
9009
System
processor
IPL
has
started
See
note
1
on
page
112.
9010
Primary
service
processor
thread
waiting
for
response
See
note
1
on
page
112.
9020
Service
processor
state
set
to
pre-standby
See
note
1
on
page
112.
9021
Service
processor
state
set
to
standby
See
note
1
on
page
112.
9022
Service
processor
state
set
to
IPL
See
note
1
on
page
112.
9023
Service
processor
state
set
to
runtime
See
note
1
on
page
112.
9024
Service
processor
state
set
to
terminate
See
note
1
on
page
112.
9025
Service
processor
state
set
to
DPO
See
note
1
on
page
112.
Chapter
4.
Checkpoints
107
Summary of Contents for 9114-275 - IntelliStation POWER 275
Page 1: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Page 2: ......
Page 3: ...IntelliStation POWER 9114 Model 275 Service Guide SA38 0636 00 ...
Page 14: ...xii IntelliStation POWER 9114 Model 275 Service Guide ...
Page 16: ...xiv IntelliStation POWER 9114 Model 275 Service Guide ...
Page 50: ...32 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 58: ...40 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 81: ...Yes Go to Step 1321 16 on page 64 Chapter 3 Maintenance Analysis Procedures MAPs 63 ...
Page 210: ...192 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 246: ...228 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 320: ...System Parts 302 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 330: ...312 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 332: ...314 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 336: ...318 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 340: ...322 IntelliStation POWER 9114 Model 275 Service Guide ...
Page 375: ......