6-69
TEST PROCEDURE
Test 20 : Check voltage at CN-52 (1) and
ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Inser t prepared pin to rear side of
connectors : One pin to (1) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
PIN
1
(1)
刮
刯
到
刱
2)
SPEC : Starting switch ON : 24
佳
2 V
300L6MS22