2-45
Opening of the poppet causes the pressure in chamber A to fall and the plunger to open. As the
result the pressurized oil at port P runs into tank passage (T).
(3)
The pressure at port P becomes lower than set pressure of the spring, the poppet is seated by
spring force. Then the pressure at port P becomes equal to set pressure of the spring and the
plunger is seated to the socket.
(4)
P
Housing
Tank
passage
T
Tank passage
T
Chamber A
Poppet
Plunger
14W92MC43
P
Socket
Housing
Tank
passage
T
Poppet
Spring
Plunger
14W92MC44
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...