2-33
B5
A5
Tank passage
From RCV
Bucket spool
P1 Parallel passage
Pa5
P04
Check 1
Check 2
P1 Bypass passage
Bucket
stroke limiter
145LCR2MC29
BUCKET IN OPERATION WITH BOOM UP OPERATION
BUCKET IN OPERATION WITH BOOM UP OPERATION
When combined operation, mostly same as previous page but the fluid from P1 bypass passage
is empty.
So only the fluid from P1 parallel passage is supplied to the bucket cylinder. Also, parallel
passage is installed the bucket stroke limiter for supplying the fluid from pump A2 to the
boom operation prior to the bucket operation. In case of the bucket out operation with boom
operation, operation is similar.
(3)
(3)
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...