7-10
Unit : mm
SWING BEARING PLAY
Measure the swing bearing play using a
dial gauge to check the wear of bearing
races and balls.
Preparation
Check swing bearing mounting cap
screws for loosening.
Check the lubrication of the swing
bearing. Confirm that bearing rotation is
smooth and without noise.
Install a dial gauge on the track frame as
shown, using a magnetic base.
Position the upperstructure so that the
boom aligns with the tracks facing
towards the front idlers.
Position the dial gauge so that its needle
point comes into contact with the bottom
face of the bearing outer race.
Bucket should be empty.
Measurement
With the arm rolled out and bucket rolled
in, hold the bottom face of the bucket to
the same height of the boom foot pin.
Record the dial gauge reading (h1).
Lower the bucket to the ground and use
it to raise the front idler 50cm.
Record the dial gauge reading (h2).
Calculate bearing play (H) from this data
(h1 and h2) as follows.
H=h2-h1
Evaluation
Measurement : (h1)
Measurement : (h2)
8)
(1)
(2)
Η
Θ
Ι
Κ
Λ
Μ
(3)
Η
Θ
Ι
The measured drift should be within the following specifications.
(4)
Model
HX145CR
HX145LCR
Standard
0.5 ~ 1.5
Maximum allowable
3.0
Remarks
(210-7) 7-10(1)
145ZF7MS09
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...