![Hyundai HX145 LCR Manual Download Page 537](http://html1.mh-extra.com/html/hyundai/hx145-lcr/hx145-lcr_manual_2196333537.webp)
8-70-4
Assemble spring pin (15).(3 pcs)
Drive shaft sub assy assembly
After heating sleeve (25), assemble O-ring
(26) to groove of inside diameter in it.
(15)
(17)
Caulking is performed on the assembled
spring pin unit.
To cover pins, implement the caulking in two
places that are located direction of 180
degrees around assembled spring pin.
Shrink fit the sleeve on drive shaft (2).
Be careful of fully seat at the bottom.
(16)
ö
(18)
ö
125LCR8SM98
125LCR8SM99
125LCR8SM100
125LCR8SM101
Caulking
two places
%"$r&"$
$
")
Pin
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...