6-69
TEST PROCEDURE
TEST PROCEDURE
Test 20
Test 20 : Check voltage at CN-52 (1) and
ground.
Prepare 1 piece of thin sharp pin, steel or
copper.
Inser t prepared pin to rear side of
connectors : One pin to (1) of CN-52.
Starting switch ON.
Check voltage as figure.
MCU
CN-51
CN-52
Female
CN-52
1
2
3
4
5
6
7
8
9
10
31
32
33
34
36
37
38
39
40
11
21
20
30
Multimeter
GROUND
PIN
1
(1)
(1)
①
②
③
④
2)
2)
SPEC : Starting switch ON : 24
±
2 V
300L6MS22
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...