![Hyundai HX145 LCR Manual Download Page 503](http://html1.mh-extra.com/html/hyundai/hx145-lcr/hx145-lcr_manual_2196333503.webp)
8-40
Disassembly of the holding valve
Remove the pilot cover with the holding valve as described on previous page.
Do not disassembled internal parts of the pilot cover.
Loosen the poppet seat and remove the poppet, spring seat, spring and check.
(spanner : 26 mm)
Pay attention not to lose the poppet.
Do not disassembled internal parts of the check.
(3)
Η
ö
Θ
ö
ö
Boom 1 spool
Socket head bolt
Pilot cover
Poppet Poppet seat
Check
Spring
Spring seat
145LCR8MC12
Spring seat
Summary of Contents for HX145 LCR
Page 11: ...SECTION 1 GENERAL SECTION 1 GENERAL Group 1 Safety Hints 1 1 Group 2 Specifications 1 10...
Page 204: ...4 5 MEMORANDUM HYUNDAI HEAVY INDUSTRIES CO LTD CONSTRUCTION EQUIPMENT DIV...
Page 627: ...8 155 125LCR8TM30 Turn casing 1 upside down and remove oil seal 3 using jig 29...
Page 657: ...8 185 8 185 Remove lock nut 22 and then boot 23 14 36078RL14 2507ARL10...