5. Check the BPTs squib circuit.
[CHECK]
For the connector (on the SRSCM side) between the SRSCM and BPT, measure the resistance between the BPTs high
and body ground.
Resistance :
∞
6. Check the Satellite sensor circuit.
[CHECK]
For the connector (on the SRSCM side) between the SRSCM and the Satellite sensor, measure the resistance between
the Satellite high and body ground.
Resistance :
∞
7. Check the SRSCM.
[PREPARATION]
A. Connect the connector to SRSCM.
B. Using a service wire, connect the DAB high and DAB low on the clock spring side of connector.
C. Using a service wire, connect the PAB high and low on SRSCM side of connector.
D. Connect the SABs and BPT using the same method.
E. Connect the negative (-) terminal cable to battery, and wait it least 30 seconds.
Page 6 of 34
24.04.2008
http://www.hmaservice.com/viewer/content.asp?IsPrint=true&imgnum=1&print_title...