[CHECK]
For the connector (on the clock spring side) between clock spring and DAB, measure the resistance between DAB high
and body ground.
Resistance :
∞
3. Check the PAB squib circuit.
[CHECK]
For the connector (on the SRSCM side) between SRSCM and PAB, measure the resistance between PAB high and
body ground.
Resistance :
∞
4. Check PSAB and DSAB squib circuits.
[CHECK]
For the connector (on the SRSCM side) between SRSCM and the SABs, measure the resistance between the SABs
high and body ground.
Resistance :
∞
Page 5 of 34
24.04.2008
http://www.hmaservice.com/viewer/content.asp?IsPrint=true&imgnum=1&print_title...