UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 05 (2018-01-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
92
Figure 3-42
Hole dimensions (unit: mm)
Step 2
Drill cabinet mounting holes in channel steel by using a hammer drill.
----End
Combining Power Cabinets and Bypass Cabinets
Step 1
The power cabinets and bypass cabinets are combined in the same way for ground installation
and channel steel installation.
----End
Securing the UPS
Step 1
Use common M12x45 bolts to secure the cabinets into the mounting holes in the channel steel
and tighten the bolts.
Step 2
Install the front, rear, left, and right anchor baffle plates.
----End
3.2.3 Installing Batteries
Context