UPS5000-E-(350 kVA-800 kVA)
User Manual (50 kVA Power Modules)
3 Installation
Issue 05 (2018-01-08)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
66
Figure 3-11
Removing the packing materials and foam
(1) Marking-off template
Step 5
Take out the marking-off template from the packing materials at the rear of the cabinet, as
shown in
Step 6
Remove the moisture-proof bag and take out the fitting box.
Step 7
Check that the UPS is intact.
1.
Visually inspect the UPS appearance for shipping damage. If it is damaged, notify the
carrier immediately.
2.
Check that the fittings comply with the packing list. If some fittings are missing or do
not comply with the packing list, record the information and contact your local Huawei
office immediately.
Step 8
Remove the screws that secure the cabinet and pallet, as shown in