4-26
Engine Servicing
(1) DOWEL PINS (2) NEW GASKET
(1) WATER PUMP COVER
(2) SEALING WASHER/BOLT
(3) BOLTS (4) LOWER RADIATOR HOSE
Install the water pump cover, sealing washer and
cover bolts.
Tighten the cover bolts in a crisscross pattern in 2-3
steps.
Connect the lower radiator hose and tighten the
hose band screw.
Pour specified transmission oil (page 3-10).
Fill the cooling system and bleed the air (page 1-1).
(1) WATER PUMP SHAFT/GEAR
(2) NEW COPPER WASHER
(3) IMPELLER
Install the water pump shaft and new copper wash-
er to the right crankcase cover.
Hold the water pump gear using a suitable tool, then
install and tighten the impeller to the specified
torque.
Be careful, the water pump impeller has left hand
threads.
Torque: 12 N•m (1.2 kgf•m, 9 lbf•ft)
Install the right crankcase cover (page 4-51).
Install the dowel pins and new water pump cover
gasket.
(2)
(3)
(1)
(4)
(2)
(3)
(1)
(1)
(2)
Summary of Contents for NSF250R 2012
Page 1: ......
Page 2: ......
Page 3: ......
Page 10: ...Memo ...
Page 18: ...Memo ...
Page 39: ...2 21 Service Data REAR BRAKE HOSE REAR BRAKE RESERVOIR HOSE ...
Page 40: ...Memo ...
Page 150: ...Memo ...
Page 192: ...Memo ...
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......