(1) DOWEL PINS
Install the dowel pins.
4-62
Engine Servicing
(1) SHIFT DRUM CENTER PIN
(2) CENTER PIN
Apply a locking agent to the shift drum center pin
threads.
Tighten the center pin to the specified torque.
Torque: 22 N•m (2.2 kgf•m, 16 lbf•ft)
(1) SHIFTER COLLAR
(2) GUIDE PLATE/SHIFT DRUM ASSEMBLY
(3) BOLTS
Place the shift drum center position other than neu-
tral.
Hold the ratchet pawls in the drum shifter, install the
guide plate/ratchet pawl assembly into the shift
drum center.
Apply a locking agent to the guide plate bolt
threads.
Install and tighten the guide plate bolts to the spec-
ified torque.
Torque: 10 N•m (1.0 kgf•m, 7 lbf•ft)
Apply transmission oil to the shifter collar sliding
surface.
Install the shifter collar to the drum shifter.
(1)
(2)
(1)
(3)
(2)
(1)
Summary of Contents for NSF250R 2012
Page 1: ......
Page 2: ......
Page 3: ......
Page 10: ...Memo ...
Page 18: ...Memo ...
Page 39: ...2 21 Service Data REAR BRAKE HOSE REAR BRAKE RESERVOIR HOSE ...
Page 40: ...Memo ...
Page 150: ...Memo ...
Page 192: ...Memo ...
Page 297: ......
Page 298: ......
Page 299: ......
Page 300: ......