![HP 8360 B Series User Manual Download Page 464](http://html.mh-extra.com/html/hp/8360-b-series/8360-b-series_user-manual_163548464.webp)
Local Operator’s
Check
Description
The preliminary check provides assurance that most of the internal
functions of the swept signal generator are working. The main check
provides a general check of the overall functions of the swept signal
generator. No external equipment is needed.
Preliminary Check
Each time the swept signal generator is turned on the swept signal
generator performs a series of self tests on the internal CPU, power
supplies, and front panel. When the self test is complete, the swept
signal generator returns to the same functional configuration that
it was in prior to power off. When the
key is engaged, the
swept signal generator returns to the factory or user preset functional
configuration.
1. Turn the swept signal generator on. Note the functional
configuration.
2. Turn the swept signal generator off. Verify that the amber
STANDBY LED is on.
3. Turn the swept signal generator on. Verify that the amber
STANDBY LED is off, and that the green POWER ON LED is
on.
a. Check the display, a cursor will appear in the upper-left corner
followed by the HP-IB language, HP-IB address, and the date
code of the firmware installed in the swept signal generator.
b. The display will now indicate the functional configuration
noted in step 1.
c. Check the fan, it should be turning.
4-2 Operator’s Check/Routine Maintenance
Summary of Contents for 8360 B Series
Page 363: ...NF N 2 w z P w D I oa 0 i B 6 7 On s5 n 20 a g 9 i T2 ...
Page 406: ...2b Menu Maps Menu Maps 2b 1 ...
Page 407: ...t t m ALC Bandwidth Select Module Sense Low High Auto AUTO Front Rear None ALC MENU ...
Page 412: ...rMENU SELECT 1 Fault Fault Info1 Info2 Fault Info3 Clear Fault S E R V I C E M E N U 6 ...