1
Build the first test connector using a BNC connector and an 8-by-2
section of Berg strip.
a
Solder a jumper wire to all pins on one side of the Berg strip.
b
Solder a jumper wire to all pins on the other side of the Berg strip.
c
c
Solder the center of the BNC connector to the center pin of one row
on the Berg strip.
d
Solder the ground tab of the BNC connector to the center pin of the
other row on the Berg strip.
8-by-2 Connector Setup
2
Build the second test connector using a BNC connector and a 1-by-2
section of Berg strip.
a
Solder two resistors to the Berg strip, in parallel across the two pins.
b
Solder the center of the BNC connector to the center pin of one row
on the Berg strip.
c
Solder the ground tab of the BNC connector to the center pin of the
other row on the Berg strip.
1-by-2 Connector Setup
Figure 7-1
Figure 7-2
Testing, Adjusting, and Troubleshooting
To construct test connectors for digital channels
7-10
Summary of Contents for 54645A
Page 5: ...iv ...
Page 12: ...1 Getting Started ...
Page 25: ...1 14 ...
Page 26: ...2 Front Panel Overview ...
Page 60: ...3 Triggering HP 54645A D Oscilloscopes ...
Page 84: ...4 MegaZoom Concepts and Oscilloscope Operation ...
Page 142: ...5 Making Measurements with HP 54645A D Oscilloscopes ...
Page 176: ...6 Using Option 005 Enhanced TV Video Trigger HP 54645A ...
Page 189: ...6 14 ...
Page 190: ...7 Testing Adjusting and Troubleshooting ...
Page 242: ...8 Replacement Parts ...
Page 259: ...8 18 ...
Page 260: ...9 Performance Characteristics ...
Page 271: ...9 12 ...
Page 272: ...10 Messages ...