11
Chapter 3: Detector System Installation
Installation Overview
Before the operational power-up phase, you must install and set up your Synapse CCD
detection system. It is recommended that you read this chapter thoroughly and follow the
steps in the order listed below for proper installation and startup.
•
Unpacking and Equipment Inspection
•
Installing Application Software
•
Mounting the Synapse Detector to a Spectrograph
•
Connecting Electrical Interface Cables
Electrostatic discharge (ESD) may damage
components of the Synapse CCD detection system if
proper precautions are not taken. The sensor and
detector head electronics are all very sensitive to ESD.
When installing the system, stand on a conductive mat
and wear a grounded ESD wrist strap. The computer
must be turned off; however, its power cord should be
connected to a grounded outlet to provide a proper
chassis to earth ground.
.
CAUTION
Note
: It must be emphasized that the HORIBA Jobin
Yvon warranty on Synapse does not cover
damage to the sensor or the system’s electronics
that arises as a result of improper handling,
including the effects of electrostatic discharge
(ESD).
Summary of Contents for JOBIN YVON SYNAPSE
Page 1: ...SYNAPSE CCD Detection System User Manual Part Number 81100 Revision 2...
Page 10: ...Preface x...
Page 14: ...System Description and Specifications 4...
Page 28: ...Detector System Installation 18...
Page 38: ...Initial Power up and Operation 28...
Page 48: ...Temperature Control 38...
Page 72: ...Appendix A Dimensional Drawings 62 Figure 17 Distance from Focal Plane to CCD Chip...
Page 73: ...Appendix A Dimensional Drawings 63 Figure 18 Synapse Power Supply Unit...
Page 74: ...Appendix A Dimensional Drawings 64...
Page 86: ...Appendix C Performing Routine Procedures with SynerJY 76...
Page 100: ...Appendix E Accessories 90...
Page 104: ...Warranty 94...
Page 113: ...103 Notes...
Page 114: ...104 Notes...