GREE GMV5 HR HEAT RECOVERY UNITS
321
Gas/liquid separator
Precondition: No refrigerant exists in the pipeline system and the power supply has been disconnected.
Step
Diagram
Operation Procedure
5. Install a new
gas/liquid separator.
●Put the gas/liquid separator based
on the position of the suction and
discharge pipes and weld the pipes
with the gas/liquid separator.
●During welding, charge nitrogen
into the pipes. The pressure should
be controlled within 0.5±0.1 kgf/cm
2
(relative pressure).
Note: Avoid nearby parts from being
burnt during welding.
●Screw the gas/liquid separator.
6. Fix and wire the
electric box.
●Put the electric box back to original
position and screw it.
●Connect all lines.
7. Check and install the
front panels.
●Check various parts and connecting
lines.
●If no problem is found, hook the
front panels and tighten the screws.
Summary of Contents for GC201808-III
Page 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Page 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Page 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Page 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Page 362: ...JF00302879 ...