GREE GMV5 HR HEAT RECOVERY UNITS
41
Construction
Air-conditioning
Engineering allocation
Engineering cooperation meeting
Engineering meeting about
socket installation and insertion
Iron frame socket installation
Frame reinforcement
Working drawing
preparation
Pipe laying
Indoor unit installation
Refrigerant piping
Water drainage piping
Piping
Insulation
Electric
Outdoor unit
foundation
Outdoor unit
installation
Leakage test
Vacuum
dehumidification
Refrigerant charging
Decorative board
installation
Ceiling preparation
Concrete engineering on the
roof
Indoor and outdoor spaces
cleaning
Pilot run after power-
on
User manual delivery
Summary of Contents for GC201808-III
Page 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Page 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Page 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Page 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Page 362: ...JF00302879 ...