(4) Anti-monsoon installation requirements for unit connecting exhaust duct:
(5) Considering snow in outdoor unit installation
(6) During the installation of the ODU, induced and exhaust pipes must be connected. In addition,
the aperture opening rate of shutters must be at least 80%, and the angle between the shutters
and the horizontal plane should be less than 20°. Requirements for installing exhaust air duct
are as follows:
1) Basic requirement for connecting an ODU to static pressure ventilating duct
When an ODU needs to be connected to the static pressure ventilating duct, the ventilating duct
must be reasonably designed. The pressure loss caused by the ventilating duct must be calculated. In
addition, a proper type of ventilating duct is necessary. To connect he static pressure ventilating duct to
the ODU, three basic parts are required:
①
ODU.
②
Canvas.
③
Steel-plate ventilating duct.
The ODU must be interconnected with the ventilating duct through canvas to prevent abnormal
vibration and noise generated by the steel-plate ventilating duct. The joint part must be tightly sealed
with tin foil to avoid air leakage.
2) Preparations for connecting an ODU to static pressure ventilating duct
a) The ODU is installed properly based on the unit installation requirement.
Summary of Contents for GC201808-III
Page 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Page 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Page 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Page 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Page 362: ...JF00302879 ...