GREE GMV5 HR HEAT RECOVERY UNITS
65
(11) Piping between indoor branch and indoor unit (
“e/f/i/j/k”)
Size of connection pipe between indoor branch and indoor unit should be consistent with the
connection pipe of indoor unit.
Piping between indoor branch and indoor unit
“e/f/i/j/k”
Rated capacity of indoor units:
X ((Btu/h)
Size of connection pipe between indoor branch and indoor unit
Gas pipe mm(in.)
Liquid pipe mm(in.)
C≤9500
Φ9.52(3/8)
Φ6.35(1/4)
9500<
C≤17100
Φ12.7(1/2)
Φ6.35(1/4)
17100<
C≤48500
Φ15.9(5/8)
Φ9.52(3/8)
5.2 Connection method when capacity of indoor unit exceeds
48500Btu/h
When connecting to the indoor unit with capacity of over 48500Btu/h, it is not allowed to connect
with only one branch; it must use two branches controlled by the same mainboard for parallel
connection.
Parallel connection
Indoor unit Communication
connection for mode exchanger
Remarks
Indoor unit No.1 and No.2
“1D1 1D2”
Parallel connection can be conducted only as the
combination of this table, it is not allowed to
otherwise connect. Note that after the connection,
manually set the SA2 dial code of corresponding
mainboard, and dial the code in the first place to
number end.
Indoor unit No.3 and No.4
“3D1 3D2”
Indoor unit No.5 and No.6
“5D1 5D2”
Indoor unit No.7 and No.8
“7D1 7D2”
Connecting method is as shown in follown Fig.
Summary of Contents for GC201808-III
Page 87: ...GREE GMV5 HR HEAT RECOVERY UNITS 83 1 External Connection for Individual Units ...
Page 92: ...GREE GMV5 HR HEAT RECOVERY UNITS 88 ...
Page 227: ...GREE GMV5 HR HEAT RECOVERY UNITS 223 Troubleshooting ...
Page 286: ...GREE GMV5 HR HEAT RECOVERY UNITS 282 Troubleshooting ...
Page 362: ...JF00302879 ...