
•Page
globalcontract.com
6
• Summer 2017
GLOBAL
Contract
STEP 1: Align two mounting holes in beam with two holes in the integrated 120º
beam bracket and secure both beams with included screws.
STEP 2: Install the Adjustable beam clamp for End of run application (A) or Shared
leg application (B). Follow the instructions described on the previous page.
STEP 3: Position beam’s end bracket over leg’s horizontal rectangular tube.
STEP 4: Use allen key to secure top and bottom bracket ends with two supplied
screws.
STEP 5: Level the whole assembly.
STEP 6: Install work surfaces and secure with supplied screws by proceeding
from the central, 120º leg to the outside of the assembly in both directions.
NOTE: 24” deep worksurfaces are mounted centrally on top of the table
structure. 30” deep worksurfaces are mounted on round legs off center, with a
longer overhang facing the user.
End of run leg position
Shared leg
position
120° Leg
A
1
4
4
3
6
2
B
INSTALLATION GUIDELINES