![Global Contract Bridges II Installation Manual Download Page 6](http://html1.mh-extra.com/html/global-contract/bridges-ii/bridges-ii_installation-manual_2232713006.webp)
Page
•
globalcontract.com
5
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Telescopic Beam
Designed to provide support for worksurfaces perpendicularly connected to a primary
table run. The telescopic beam is connected to the leg’s horizontal, rectangular tube
on one side, while the opposite side is secured off module to the perpendicular,
central beam and can be adjusted to accommodate 24” and 30” deep primary
worksurfaces.
STEP 1: Position beam’s end bracket over leg’s horizontal, rectangular tube.
STEP 2: Secure top and bottom bracket ends with two supplied screws.
STEP 3: Adjust the length of the telescopic beam in accordance with the depth of
primary worksurface. Completely contracted beam will support perpendicular side
table connected to 24” deep primary worksurface on Round and Rectangular legs.
Middle position is intended to support perpendicular side table connected to 30”
deep primary worksurface on Round legs. Fully extended telescopic beams supports
perpendicular side table connected to 30” deep primary worksurface on Rectangular
legs.
STEP 4: Position end bracket of the telescopic beam over the primary, perpendicular
beam. Level the whole assembly.
STEP 5: Install primary worksurface.
STEP 6: Secure the secondary worksurface to legs fi rst.
STEP 7: Adjust the secondary worksurface/telescopic beam position.
STEP 8: Secure the worksurfaces with fl at brackets.
3
4
2
1
5
6
7
8