
•Page
globalcontract.com
32
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Storage Mounted B3 Divider - Accessory Tile & Fabric Tile Combo Installation
Storage Mounted Service Panels Finishing Trim
STEP 1: Step 1: Install accessory rail locking bracket, machine screws go in to the
provided inserts. Leave screws loose so that the bracket can slide up and down.
STEP 2: Install accessory rail & push locking bracket up to allow accessory rail to
be in correct position.
STEP 3: Once both sides have the accessory rail installed, pull the locking bracket
downward so that it secures the accessory rails on both sides. When locked,
tighten the screws.
STEP 4: Insert fabric tile diagonally into the bottom extrusion of the accessory rail,
then rotate tile into fi nal position and push bottom to lock into the tile retainers.
1
2
3
4
NOT UL LISTED