
•Page
globalcontract.com
48
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Square Corner and Inline Block, no Outlet
25” high square corner block can function as a self-supporting, freestanding
unit or it can be secured to adjacent bridges seats. 6” block must be supported
by a seat on either side.
STEP 1: Drive seat and the block levelers all the way in and align the units.
STEP 2: Use Allen key to loosen screws (A) at the farthermost points of support
legs.
STEP 3: Slide four brackets over partially loosened screws (A).
STEP 4: Use supplied wood screws to secure the brackets to the block.
Note: The 6” in-line block is provided with four pilot holes per side.
STEP 5: Hold the block tight against the side of the seat and secure the brackets
by driving supplied screws through the leg, into the seat structure.
STEP 6 Re-tighten the A screws.
Note: 6” block must be supported by a seat on either side. Repeat the above
procedures to secure the seat on the opposite side of the 6” block!
Tablet Arm
Tablet arm is exclusively supported by 6” in-line table block. If specifi ed with
Tablet arm the 6” in-line table block comes assembled, including tablet grom-
met sleeve embedded in the top.
STEP 1 Remove Tablet from packaging and slide its preinstalled pivoting
bracket into the grommet sleeve.
STEP 2 Use Allen key to drive in the set screw, but do not tighten.
Note: The set screw only prevents the tablet bracket from pulling out of the
sleeve. The set screw is not intended to lock the Tablet in fi xed position!
3
4
4
5
6
1
2
1
a2
NOT UL LISTED