
•Page
globalcontract.com
44
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Storage and Boulevard Systems Integration
Several storage units have been designed to connect to Boulevard panel vertical slots.
These specialized units are supported by a leg at the front and by a set of included
brackets at the back.
Identify type and location of the unit. Set of holes on the unit’s back allow the unit to be
connected “on module” ( 30” wide unit connected to 30” wide panel) or “off module”
(42” unit connected to 36” or 30” wide panel). Establish desired location of brackets.
STEP 1: Insert brackets into the back of the storage unit so that the teeth of the
longer top bracket point downward and the teeth of the bottom bracket point
upward as illustrated.
STEP 2: While holding the top bracket from behind, secure it with supplied
fastener and tighten.
STEP 3: Secure the bottom bracket, but Do NOT tighten. The bottom brackets
must be free to slide up in the slots.
STEP 4: This step requires two people, one per storage unit side. Engage top
brackets into panel’s vertical slots while guiding the bottom brackets in as well.
STEP 5: Wiggle the bottom brackets up so that the bracket’s teeth fi rmly engage
with the panel’s vertical slots.
STEP 6: Tighten the fasteners.
Ensure that the all bracket fasteners are tight and that there is no movement
between the brackets and the panel.
1
2
3
4
5
5
6
NOT UL LISTED