
Page
•
globalcontract.com
27
• Summer 2017
GLOBAL
Contract
INSTALLATION GUIDELINES
Full Height Rectangular Leg Gable
Note: Rectangular leg gables can only be installed on rectangular legs. Proceed by
removing vertical cable manager from both legs fi rst.
STEP 1: Align top brackets with pilot holes and secure with supplied screws.
STEP 2: Align bottom brackets with pilot holes as illustrated and secure with supplied
screws.
STEP 3: Slide the bottom brackets under the bottom of the leg extrusion.
STEP 4: Wiggle the gable slightly up while making sure that both bottom brackets are
engaged with the leg extrusion.
STEP 5: Rotate into vertical a position until both top brackets come between the bottom
of the worksurface and the horizontal leg beam.
STEP 6: Secure the top brackets with two supplied screws while making sure that the
bottom tabs remain engaged in the leg groove.
1
2
6
5
6
4
3
NOT UL LISTED